Please see the attached letter and resolution that the Merrillan Village Board approved on October 10th and sent via certified mail to Union Pacific reference the E Pearl St railroad crossing. We do have unofficial word that they should begin work on this crossing yet this week, but no official notification has been provided to the Village confirming this.
REQUEST FOR BID
Project Overview:
The Village of Merrillan is seeking a qualified consultant to conduct a Comprehensive Energy Plan at its existing facilities to identify the feasibility of converting its energy delivery system from 2400 volts to 7200 volts. The goal of this project is to reduce energy losses, increase resiliency, and reliability, such as undergrounding, while also identifying opportunities for electric infrastructure efficiency upgrades and transitioning generating facilities from diesel to natural gas and/or solar generation.
#B-2024-01
Bidding Opens October 7th, 2024 at 7AM
Village of Merrillan Comprehensive Energy Plan and Electric Infrastructure Upgrades
Scope of Work:
The successful bidder will be responsible for conducting the following tasks:
Requirements:
The successful bidder must possess the following qualifications:
Submittal Requirements:
Bidders must submit the following documents:
Evaluation Criteria:
Proposals will be evaluated based on the following criteria:
Important Bidding Details:
Contact Information:
For questions or additional information, please contact:
Christopher Wruck
President, Village of Merrillan
cwruck@merrillanwi.gov
608-487-3505
Bid Due Date:
Proposals must be received by December 2nd 2024 at 3:30 PM CST either in person or by mail: Village Hall, 101 S Main St, PO Box 70, Merrillan, WI 54754 – or – via email hi@merrillanwi.govThe formal delivery date for this planning project is June 1st, 2025.
We’re aware of the power outage. Please turn off all unnecessary electronics to help conserve and limit the load on the system. Crew is on the way to investigate.
Please see the attached flyer for more information.
It has come to our attention that the sidewalk along Gile Park between the bridge and south to Park Drive is slippery. This is normally wet due to the amount of water we have received, but today it was found that there is an oil-like substance making it extremely hazardous. This oil-like substance is a polymer oil used for hydraulic boring when crews have been putting in the fiber optic cables. Due to the high amount of rain and the water table currently, we are told it is leaking out in many areas where fiber optic lines have been buried. Please use caution as always on wet sidewalks, but if you notice an oil-like fluid coming up within the Village, please let us know.
This area has been blocked off until we can get it cleaned up. Note, the grassy area surrounding the sidewalk here is waterlogged and has this fluid in it as well, so please use caution and care within the vicinity.
Power should be restored now. Thank you for your patience.
The electric line maintenance is taking a little longer than expected due to other areas of concern being addressed. We will post an update when everything is complete. Thank you for your patience.
Electric line maintenance will be performed on July 11th, 2024 from approximately 9am-10am CST. This will affect East Pearl St (east of the bridge), Bunting Ln, and Beach Dr residents. The power will be out for approximately 30-60 minutes if everything goes smooth. The purpose of this maintenance is to address a line issue in a tough-to-reach area that has been causing increased outages recently. Please plan accordingly.